The Practice

Founded in 2014 by Joaquin Gindre, Keeps Architect has grown into a distinguished practice with offices in Surrey and Oxfordshire. We provide a fully integrated architectural service, guiding projects from concept to completion with meticulous attention to detail.

Preparation & Briefing

Duration | Approximately 2-3 weeks

• Identify project requirements and finalise the brief
• Identify risks (drainage, Planning Policies, neighbouring properties).
• Identify sustainability targets.
• Identify project budget.
• Carry out measured survey of the existing property (Plans and Elevations)
• Carry out tree survey
• Carry out topographical survey if required
• Photograph the existing building (internally & externally)

Stage 01
Stage 02
Stage 03
Stage 04
Stage 05
Stage 06
Preparation & Briefing
Concept Design
Developed Design & Application
Technical Design
Tender & Construction
Handover & Close Out
Our approach

With a curated network of elite consultants and master builders, we ensure a seamless design and construction experience. Our mission is to create timeless, bespoke spaces that surpass expectations, blending vision, craftsmanship, and architectural excellence.

Sustainability

Sustainability is at the core of what we do. With extensive experience in creating sustainable designs for new builds, extension and renovations. We strive to integrate eco-friendly solutions right from the start of every project. From the initial concept sketches to the selection of materials and systems, we prioritize choices that will have lasting positive effects. We embrace Passivhaus principles wherever they are applicable, to enhance energy efficiency and sustainability.

Responsible Design

We prioritize responsible design and are dedicated to supporting carbon capture and storage in the residential property industry. Our approach aligns with our clients' goals for sustainable, energy-efficient homes while improving their connection with the surrounding environment.

FAQ's

Do you have set fees?

How does the design process work?

Are we able to make changes to the design during the construction stage?

Are you a project manager / do you oversee the construction phase?

Do you submit Building Control or Planning Applications?